Rss Feed
Tweeter button
Facebook button
Technorati button
Reddit button
Myspace button
Linkedin button
Webonews button
Delicious button
Digg button
Flickr button
Stumbleupon button
Newsvine button
Youtube button

architecture buzz!!

Icon

Buzz Only Selected Architecture

Zagreb Dance Center | 3LHD

Zagreb Dance Center | 3LHD
Photo©Sandro Lendler

The opening of big movieplex cinemas in Zagreb has led to the dying out of old cinema theatres in the city centre. The City of Zagreb, who is the owner of the old cinema Lika, decided to reuse the space for new cultural facilities. In that scenario old cinema Lika was given the role of a new dance centre. 3LHD was in charge for this project.Zagreb Dance Center | 3LHD
Photo©Sandro Lendler

Fifty years of contemporary dance culture in Zagreb has produced about 40 dance troops, with this project all of them will have a new home in the city centre. The cinema is located in a derelict residential block only 100 meters away from the Zagreb’s main square. The entire project’s program is determined by the gross developed area defined in the master plan and it places the project in the old cinema shell. The new dance centre which will house numerous dancers, choreographers, art troops and companies will have three multipurpose studios (one large studio with 150 telescopic seats and two smaller training studios), three spacious dressing rooms, bathrooms, storages for props and technology and office spaces.

Zagreb Dance Center | 3LHD
Photo©Sandro Lendler

The only new architectural element of the centre is the new entrance lobby, a polyvalent space in the service of communication and meeting with a cafe, library and a video store. It was interpolated on the basis of almost default parameters of the existing neighboring houses. The volume and its broken forms also suggest dance movement and they are a new sign and connection element between the courtyard and the roof terrace. The roof terrace is the final element of the centre and an important part of the project of preservation and restoration of Zagreb last open roof stage.


Drawings courtesy 3LHD


Photo©Sandro Lendler

Project name: Zagreb Dance Center  – reconstruction of old cinema Lika
Short project name:Dance Center
Program:public, culture
Status:   completed
Project year:2003
Project start date: 2003
Project end date: 2005 / 2008
Construction start date: 11/2005 I phase; 11/2008 II phase
Construction end date:09/2009

Location:Ilica 10
City: Zagreb
Country: Croatia
Site area (m2):1360
Gross floor area (m2):1438
Volume (m3): 7082
Footprint (m2):760
Entry level (m): 123
Client:City of Zagreb
Author: 3LHD

Project team: Sasa Begovic, Marko Dabrovic, Tatjana Grozdanic Begovic, Silvije Novak, Jasminka Jug, Zorislav Petric, Zeljko Mohorovic, Dijana Vandekar, Marin Mikelic

Colaborators: Structural Engineering – Berislav Medic, Hrvoje Mihal, UPI-2M; Building Physics / Details, Mateo Bilus, B.M.P.; Fire Protection- consultant – Milan Carevic, Inspekting; MEP Engineering – Mechanical – Igor Šundov, Rena prom; MEP Engineering – Mechanical – Mario Josipovic; MEP Engineering – plumbing – Nenad Sutevski, Vodotehnika; Electrical Engineering – Radovan Tomsic, RP studio; Electrical Engineering – Renato Majcunic, MR konzalting; sprinkler installation – Kaleb inzenjering; Special Consultant – Slaven Delalle; 3D visualization – Janko Velnic
Main contractor:        I phase     TA-GRAD
II phase    MESIC COM
AVC (scene technology)

Supervision:         I faza    PET PROJEKT
II faza    Interkonzalting

Related posts:

  1. Business Center Miramare | 3LHD
  2. Zamet Centre | 3LHD
  3. Sports Hall Bale | 3LHD
  4. Dance Palace | UNStudio
  5. LIBRARY AND LEARNING CENTER (LLC) UNIVERSITY OF ECONOMICS & BUSINESS, VIENNA, AUSTRIA

Category: Buzz

Tagged:

Leave a Reply